Figure 1 is entitled "Schematic of Model Framework for Analysis of Cost Impact of FoPP Availability (Base-Case Analysis)". The figure is a diagram of two columns, one being "WORLD WITHOUT FoPPs" and the second being "WORLD WITH FoPPs." Each column has 5 seperate steps of calculations which then lead to Step 6, which is a calculation shared by both columns. This particular diagram demonstrates the likely number of FoPP entrants is a key determinant of the estimates of cost impact of FoPP competition.

Back to text

Figure 2 is entitled "Schematic of Model Framework for Analysis of Cost Impact of FoPP Availability (Base-Case Analysis)". The figure is a diagram of two columns, one being "WORLD WITHOUT FoPPs" and the second being "WORLD WITH FoPPs." Each column has 5 seperate steps of calculations which then lead to Step 6, which is a calculation shared by both columns. This particular diagram demonstrates the likely number of FoPP entrants is a key determinant of the estimates of cost impact of FoPP competition.

Back to text